Completed Projects

Kemalpaşa Organised Industrial Zone Railway Connecting Line Infrastructure and Superstructure Construction(Phase I - II - III )

Kemalpaşa Organised Industrial Zone Railway Connecting Line Infrastructure and Superstructure Construction(Phase I - II - III )

The first phase of the 3-stage Kemalpaşa Organised Industrial Zone (KOSBI) Railway Connecting construction started in 2007. The rail road work connecting one of the most important organised industrial zones of Turkey to the existing railway line was carried out in 3 phases.

Phase I  Contract Date: Completion: Length:

With the completion of this important project, 300 industrial enterprises within KOSBI, which is established over an area of 680 hectometres, have been enabled to use the existing railway lines for transport.