Ongoing projects

Yoncalı Irrigation Transmission Tunnel Construction

Yoncalı Irrigation Transmission Tunnel Construction

Construction of a 4.5-metre inner diameter transmission tunnel, inlet-outlet structures, shaft and water intake structure constructions to carry water from Yoncalı Dam reservoir to the project area in order to irrigate 17115 ha of agricultural areas of Arguvan district and villages of Malatya province.

In this context, a 8835-metre long tunnel is being constructed by a tunnel boring machine and a 403-metre long tunnel with 5-metre inner diameter is being constructed by a conventional method.